Sunday, March 22, 2009

The rest of the Before photos

The Kitchen:
Tiles on the floor stay
Tiles on the wall go
Wallpaper is already removed
Adhesive is being washed off now
Primer comes next
Colored Paint next (ceiling and left wall will be cream, all the rest coffee)
New ceiling lamp needs to be purchased and installed
New entire kitchen comes on April 23 (all appliances and cabinets) Luckily this will be professionally installed




The living room:





Bianca helping by squatting on torn off wallpaper:



Agust, despite doing very little work, stops to pose with MY mask on as if he was working in the dust filled room.



The Hallway, which sadly still looks just like this. It has the most work still to do.

No comments:

Post a Comment